Our Services

We partner with architects, designers, and owners to design, coordinate, and validate integrated technology systems — including lighting, controls, audio, video, infrastructure, and shading — ensuring technical systems support architectural intent from early design through commissioning and occupancy.

Technology Strategy & Early Design Support

Engaged during SD / early DD

Who this helps:
Architects, interior designers, lighting designers, owners

What we provide:

  • Technology vision aligned with project goals

  • System feasibility reviews

  • Early coordination input for ceilings, glazing, millwork, and structure

  • Budget-appropriate technology pathways (now vs future-ready)

Typical deliverables:

  • High-level technology narratives

  • Preliminary system diagrams

  • Early risk and coordination flags

  • Design-phase recommendations (not product-driven)

Value to designers:
Prevents late-stage redesigns and protects design intent.

Design-Phase Documentation & Construction Support

Bridging design and reality

Who this helps:
Design teams, owners, contractors

What we provide:

  • Design-assist documentation

  • Bid and scope clarification support

  • Submittal and shop drawing review

  • Construction-phase technical guidance

Typical deliverables:

  • Design clarifications

  • Coordination responses

  • Review comments

  • Field issue resolution support

Value to designers:
Design intent survives construction.

Commissioning & System Validation

Ensuring Design Intent Is Realized

Technology systems do not perform correctly simply because they are installed. Lighting, shading, audio, video, and control systems must be intentionally configured, tested, and validated to ensure they operate as designed and support the architectural experience.

Commissioning is the phase where design intent is confirmed, refined, and finalized.

Who This Helps

  • Architects

  • Interior designers

  • Lighting designers

  • Owners and facilities teams

Typical Deliverables

  • Commissioning checklists and verification summaries

  • Finalized scene and control configuration documentation

  • As-configured system narratives

  • Identified deviations from design intent (if any) with recommendations

  • Owner handoff documentation and guidance

Value to build team:

These deliverables provide clarity and accountability — not just proof of completion.

What We Provide

System-Level Commissioning

  • Verification that each technology system performs according to the design narrative

  • Validation of wiring, addressing, zoning, and system architecture

  • Confirmation that integrations function as intended — not just individually, but together

Lighting & Control Tuning

  • Fine-tuning of lighting levels, fades, and transitions

  • Scene refinement based on spatial conditions and materials

  • Alignment between lighting, shading, and daylight behavior

  • Adjustments made with architectural intent in mind, not defaults

Integration Verification

  • Confirmation that:

    • Lighting responds properly to control inputs

    • Shading and daylight strategies are synchronized

    • Audio, video, and environmental systems behave predictably

  • Stress-testing of scenes, sequences, and system interactions

User Experience Validation

  • Evaluation of how occupants actually interact with the space

  • Confirmation that control logic is intuitive and consistent

  • Refinement of interfaces to reduce cognitive load and friction

Contact us

Interested in working together? Fill out some info and we will be in touch shortly. We can’t wait to hear from you!